EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
DaveBellairs
- Entry
Date:
Dec 11, 2023
Hours:
1
Pitot tube and heat controller
Category: Wings
Description:
Wires from the pitot heat controller were long enough to reach outside the pitot mast so I connected the spade connectors of the controller and pitot and installed the pitot tube. Now to figure out how to secure the wires and tubing inside the wing.
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.